The following pictures show the installation of the double girder crane on site. We collaborated with the mechanical installation engineer and electrical engineer to assemble the mechanical parts, complete the electrical wiring, and adapt the crane program to the customer’s workshop system. In line with the customer’s requirements, we conducted both static load tests and full load tests. During the tests, the crane operated smoothly and quietly, leading to the customer’s satisfaction with the entire process.