Installation and Testing of Double Girder Overhead Crane for UAE Customer

Novemba 15, 2024

The following pictures show the installation of the double girder crane on site. We collaborated with the mechanical installation engineer and electrical engineer to assemble the mechanical parts, complete the electrical wiring, and adapt the crane program to the customer’s workshop system. In line with the customer’s requirements, we conducted both static load tests and full load tests. During the tests, the crane operated smoothly and quietly, leading to the customer’s satisfaction with the entire process.

cindy
Cindy
WhatsApp: +86-19137386654

Mimi ni Cindy, nina uzoefu wa miaka 7 wa kufanya kazi katika tasnia ya crane na nimekusanya maarifa mengi ya kitaalam. Nimechagua korongo za kuridhisha kwa wateja 1000+. Ikiwa una mahitaji yoyote au maswali kuhusu cranes, tafadhali jisikie huru kuwasiliana nami, nitatumia ujuzi wangu na uzoefu wa vitendo kukusaidia kutatua tatizo!

Tuma Uchunguzi Wako

  • Barua pepe: sales@hndfcrane.com
  • Simu: +86-182 3738 3867

  • WhatsApp: +86-191 3738 6654
  • Simu: +86-373-581 8299
  • Faksi: +86-373-215 7000
  • Skype: dafang2012

  • Ongeza: Wilaya ya Viwanda ya Changnao, Jiji la Xinxiang, Mkoa wa Henan, Uchina
Bofya au buruta faili hadi eneo hili ili kupakia. Unaweza kupakia hadi faili za 5.