3T Single Girder Overhead Cranes Delivered to Thailand

Nisan 17, 2025

A customer from Thailand was comparing multiple suppliers and found that although our product quote under FOB terms was competitive, the advantage disappeared once sea freight was included.

Through further communication, we discovered that the customer’s concerns were not just about price, but also about logistics timeliness and risk control.

To address the customer’s concerns, we took the following actions:

  • Complete dynamic adjustment of trade terms (FOB→CIF) within 48 hours, incorporate sea freight into our cost system, and simultaneously optimize the packing plan to increase the loading rate by 15%.
  • Combined with the Songkran holiday in Thailand, coordinate the shipping company to enable priority channels to ensure that the goods arrive at the port 6 working days earlier than conventional transportation.

Results achieved:

  • Visualization of customer procurement costs reduced by 8.3%.
  • The supply chain cycle was shortened to 18 days (the industry average was 23 days).
main beam of 3t single girder overhead crane 4
main beam of 3t single girder overhead crane 6
Cindy
Cindy

Ben Cindy, vinç sektöründe 10 yıllık çalışma deneyimim ve çok sayıda profesyonel bilgi birikimim var. 500'den fazla müşteri için tatmin edici vinçleri seçtim. Vinçlerle ilgili herhangi bir ihtiyacınız veya sorunuz varsa lütfen benimle iletişime geçmekten çekinmeyin, uzmanlığımı ve pratik deneyimimi kullanarak sorunu çözmenize yardımcı olacağım!

Sorgunuzu Gönderin

  • E-posta: satış@hndfcrane.com
  • Telefon: +86-182 3738 3867

  • Naber: +86-191 3738 6654
  • Tel: +86-373-581 8299
  • Faks: +86-373-215 7000
  • Skype: dafang2012

  • Adres: Changnao Sanayi Bölgesi, Xinxiang Şehri, Henan Eyaleti, Çin
Yüklemek için dosyaları bu alana tıklayın veya sürükleyin. En fazla 5 dosyası yükleyebilirsiniz.